Generative AI Fundamentals Map
Map/Energy/Wave 2

Datacentre local backlash

Local opposition that blocks or delays datacentres and the plants and lines they need.

brakeBuilt today Open on the map →

Facts

Lane
Energy
Wave
2 of 12 (build order, not a date)
Needs
2 boxes all the way back through hard links
Unlocks
1 boxes downstream through hard links
Cluster
Assistants and the public

Evidence as of October 2026

71% of Americans oppose a new AI datacentre near them, more than the 53% who oppose a nuclear plant. At least 45 projects worth about $68bn were blocked or delayed in the second quarter of 2026.

  1. 01State of AI 2026: compute
  2. 02NPR: datacentre opposition and the 2026 midterms

Watch
Datacentre projects blocked or delayed: 45 worth about $68bn in Q2 2026.

Around it

Needs · 2
Unlocks · 1

Brakes

This box works against

Loops and off-ramps